Home / News / Industry Trends /

Installation steps of large flow security filter element

Author:Lefilterdate:2023-04-16 10:25:16

Lifelt large-throughput filter adopts large-flow pleated filter element, which is mostly used for security filtration, cleaning filtration, backwash filtration, condensate filtration, etc. in water treatment with large flow. Relying on many years of filtration technology, the company has continuously improved the structure and process, and now produces large-flux filters with compact structure, advanced technology, stable and reliable quality, and are widely used in many fields. This kind of filter uses imported large flow pleated filter elements such as 3M, Parker, Lifelt, etc., which can obtain a larger effective filtration area. Ensures stable filtration in a compact space.


Introduction to the installation steps of the large flow security filter element:


1. First clean the filter housing thoroughly;


2. Connect the inlet and outlet of the shell with the pipeline of the filtration system. When connecting, pay attention to the direction of the connection, ensure that the outside of the filter element enters the water, and measure the state of the water outlet inside;


3. Open the plastic bag at one end of the filter element opening, check whether the O-ring is intact and in place;


4. Use a suitable wetting agent to wet the O-ring and the filter seat socket;


5. Hold the end of the filter element close to the O-ring, and vertically insert the filter element socket into the filter element socket completely;


6. After inserting all the filter elements, remove the outer packaging of the filter elements, then buckle the pressure plate to fix it, and then install the metal cover;


7. Open the vent valve on the top of the housing;


8. Open the inlet valve a little so that the liquid can enter the housing until the liquid overflows from the air release valve on the top of the housing, at which point the air release valve can be closed;


9. Slowly adjust and open the downstream outlet valve until it is fully open;


10. Slowly adjust and open the inlet valve until the pressure on the upstream and downstream of the filter drops to 0.02mpa when it is fully opened.

大流量保安过滤器 (1)